0
Is Russia wanting to control some more oil?
Wednesday, August 13th, 2008
The Baku-Tbilisi-Ceyhan pipeline, led by BP, was opened in 2006 and is capable of pumping one million barrels per day of Azeri crude along the 1,040-mile route to the Turkish port of Ceyhan.
It is the first pipeline to carry large volumes of crude out of the Caspian without going through Russia.
Strangely it goes through Georgia:
